IMPLEMENTATION OF C4.5 ALGORITHM TO ASSIST IN THE SELECTION OF FLOOR CONSTRUCTION PROJECTS

Aditya Roval Lendra(1), Diky Firdaus(2),


(1) Department of Computer Science, Mercu Buana University, Jakarta
(2) Department of Computer Science, Mercu Buana University, Jakarta
Corresponding Author

Abstract


The country of Indonesia is a developing country. This is indicated by the improvement of the development process and business. So, many development projects will appear. With the changing world in the industry with e-Government governance, project data is no longer in paper form. With the emergence of data - a lot of companies need to do project management activities in determining the project strategy to be taken so as not to affect the final results in determining the taking of the project. Then do a lot of research on the project data that appears in the construction world. The method used for this research is the C4.5 Algorithm which is one of the modern algorithms for data mining processes. C4.5 algorithm is also called a decision tree (decision tree) which is one of the classification methods with a tree structure representation. The concept is to collect data and be made into a decision tree based on the rules needed to get an outcome. The pattern and results obtained will be used for recommendations in determining which projects the company will take. The values generated using Rapidminer are Accuracy 97.18%, precision 100%, and recall 94.31%. With the result, 1205 recommended floor construction projects were taken and 784 projects were recommended not to be taken.

Keywords


Datamining; Classification, C4.5 Algorithm, Construction, Floor project,

References


D. Ramayanti and U. Salamah, “Text Classification on Dataset of Marine and Fisheries Sciences Domain using Random Forest Classifier,” Int. J. Comput. Tech., vol. 5, no. 5, pp. 1–7, 2018.

B. Ferdiansyah and L. Goeirmanto, “Prediksi Loyalitas dalam Keterikatan Karyawan terhadap Perusahaan Menggunakan Algoritma C4.5* (Studi Kasus PT.XYZ),” J. Sist. dan Teknol. Inf., vol. 8, no. 1, p. 87, 2020.

M. F. Arifin and D. Fitrianah, “Penerapan Algoritma Klasifikasi C4.5 Dalam Rekomendasi Penerimaan Mitra Penjualan Studi Kasus : PT Atria Artha Persada,” InComTech, vol. 8, no. 2, pp. 87–102, 2018.

A. Nursin, S. Wacono, and K. Kunci, “MODEL FOR ASSESSMENT OF PERFORMANCE CONSTRUCTION MANAGEMENT PROJECT,” vol. 10, no. 1, 2011.

J. Fondasi, M. Natalia, and Y. Partawijaya, “Analisis Critical Success Factors,” vol. 6, no. 2, 2017.

M. F. Sufa, “Identifikasi Kriteria Keberhasilan Proyek,” Performa, vol. 11, no. 1, pp. 19–22, 2012.

T. H. Setiawan and T. Ariadi, “Indikator Keberhasilan Proyek Pembangunan Bangunan Gedung Yang Dipengaruhi Faktor Internal Site Manager,” vol. 11, no. 2, pp. 128–134, 2012.

H. Hendrawan, “Faktor yang Mempengaruhi Keberhasilan Penerapan Teknologi Bidang Jalan dengan Kontrak Rancang Bangun,” Media Komun. Tek. Sipil, vol. 24, no. 1, p. 45, 2018.

Perdana, “済無No Title No Title,” J. Chem. Inf. Model., vol. 53, no. 9, pp. 1689–1699, 2018.

T. B. Santoso and D. Sekardiana, “PENERAPAN ALGORITMA C4.5 UNTUK PENENTUAN KELAYAKAN PEMBERIAN KREDIT (Studi Kasus : Koperia - Koperasi Warga Komplek Gandaria ) Implementation of C4 . 5 Algorithm to Determine the Feasibility of Loan,” J. Algoritm. Log. dan Komputasi, vol. ll, no. 1, pp. 130–137, 2019.


Full Text: PDF

Article Metrics

Abstract View : 339 times
PDF Download : 77 times

DOI: 10.56327/ijiscs.v4i3.947

Refbacks

  • There are currently no refbacks.