IMPLEMENTATION OF THE SCHOOL SOLAR PANEL SYSTEM TO SUPPORT THE AVAILABILITY OF ELECTRICITY SUPPLY AT SDN 4 MESUJI TIMUR

Sampurna Dadi Riskiono(1), Lulud Oktaviani(2), Fatimah Mulya Sari(3),


(1) Faculty of Engineering and Computer Science, Indonesian Teknokrat University, Bandar Lampung
(2) Faculty of Letters and Educational Sciences, Indonesian Teknokrat University, Bandar Lampung
(3) Faculty of Letters and Educational Sciences, Indonesian Teknokrat University, Bandar Lampung
Corresponding Author

Abstract


Equitable development is always encouraged by both the central and regional governments. However, in practice it is not easy and goes through a fairly long process. Likewise, the efforts of the government, especially the province of Lampung, are trying to carry out development through equal distribution of electrical energy to areas where the National Cross Border Center (PLBN) is located, such as Mesuji Regency, although it is still unstable and uneven throughout the village. The condition of the lack of electricity supply causes blackouts to occur frequently and in a relatively long period of time. This greatly affects community activities and is no exception in terms of education or at school, especially in the use of technology-based learning media and school administrative matters, such as filling out report cards and so on. Nowadays, filling out report cards must be done through technology-based applications that require electronic equipment such as laptops to use them. The design of the School Solar Panel System (SSPS) is intended in an effort to increase the availability of electricity in supporting teacher professionalism in carrying out learning activities. So that with the design of the School Solar Panel System which will be implemented later, the electricity supply remains available even though there is a power outage.

Keywords


Design, School Solar Panel System, Availability of Electricity

References


Reily, M. (2019, 26 Agustus). Jokowi Resmi Tetapkan Dua Kabupaten di Kaltim Jadi Calon Ibu Kota Baru. Diakses dari https://katadata.co.id/berita/2019/08/26/jokowi-resmitetapkan-dua-kabupaten-di-kaltim-calon-ibu-kota-baru-indonesia.

Dahlan, M. H. (2014). Perpindahan Penduduk dalam Tiga Masa: Kolonisasi, Kokuminggakari, dan Transmigrasi di Provinsi Lampung (1905-1979). Patanjala, 6(3): 335-348.

Niari, R., Asyik, B., & Zulkarnain, Z. (2013). Faktor-Faktor Pendorong Dan Penarik Yang Menyebabkan Penduduk Suku Banten Bermigrasi Ke Kelurahan Sukajawa Kecamatan Tanjung Karang Barat Tahun 2012. Jurnal Penelitian Geografi, 1(2): 1-9.

Yaslan, M. (2017). Bupati Mesuji Sebut 40 Desa Belum Dialiri Listrik. Diakses dari https://www.republika.co.id/berita/nasional/daerah/17/09/25/owtrvl384-bupati-mesujisebut-40-desa-belum-dialiri-listrik.

Penick, T. & Louk, B. (1998).Photovoltaic Power Gen-eration. Gale Greenleaf.

Fahrenbruch, A., & Bube, R. (2012).Fundamentals ofSolar Cells: Photovoltaic Solar Energy Conversion.Elsevier.

Rashid, M. H. (2011).Power Electronics Circuits,Devices, and Application(3rd ed.), Prentice Hall.

Bansai, NK, et al., (1990), Renewable Energy Sources And Conversion Technology, Tata McGraw-Hill Publishing Co. Limited, New Delhi.

Widodo, Djoko Adi, Suryono, Tatyantoro A, (2010), Pemberdayaan Energi Matahari Sebagai Energi Listrik Lampu Pengatur Lalu Lintas, Jurnal Teknik Elektro, 2(2): 133-138.


Full Text: PDF

Article Metrics

Abstract View : 840 times
PDF Download : 107 times

DOI: 10.56327/ijiscs.v5i1.960

Refbacks

  • There are currently no refbacks.